Install new watermain and storm improvements on NE 92nd St.
2024, Seattle
NE 92nd Utility Improvements
Water & Storm, 3 months
Repair a 22 ft deep sewer in the heart of downtown Seattle under emergency bypass.
2024, Seattle
4th & Virginia Sewer Emergency
Sewer, 1 month
Install new water main, cathodic protection, repave roads and restore sidewalks at seven sites.
2024, Seattle
Water Main Rehab #5
Water, 2 years
Install drainage and remove contaminated soil. Repair roadway, railroad.
2024, Port of Seattle
Terminal 5 Intermodal Yard Improvements
Roadwork, 6 months
7.5 miles of new bike lanes, new sidewalk and improved signaling.
2023, Edmonds
Bike and Walkway Improvements
Roadwork, 4 months
Small strategic upgrades 6 different locations, including utilities, concrete and electrical.
2023, Issaquah
Small Strategic Projects
Roadwork, 4 months
Install lighting, EV charging, utilities and permanent restrooms to support taxi operations.
2023, Port of Seattle
160th TNC Lot Upgrades
Earthwork, 1 year
Perform Urgent Sewer Repairs for SPU.
2023, Seattle
Spot Sewer Repair #5
Sewer, 2 years
Installing 1,470 lf 12" HDPE sewer main, 1,400 LF of CIPP and roadwork.
2023, City of Renton
Thunder Hills Sewer Interceptor Rehabilitation
Sewer, 6 months
Retrofit lift station structure with pumps, valve and meter vault, sewer piping, and electrical.
2023, SW Suburban Sewer District
Lift Station 18 Phase 2
Sewer, 6 months
Construct new retaining wall with permanent shoring, fencing, parking lot.
2023, Seattle Housing Authority
West Seattle Facility Site Work
Earthwork, 2 months
Construct bicycle, pedestrian, and traffic signal improvements.
2023, Seattle
NE 117th Intersection Redesign
Road Improvements, 4 months
Install a soldier pile wall, utilities, restore landscape and roadway.
2023, Bellevue
98th Ave Slope Stabilization
Earthwork, 4 months
Emergency sewer repair in SoDo.
2022, King County
Emergency Sewer Repair
Sewer, 1 week
Install 1000 LF of conduit on 236th St, including crossing I-5.
2022, Snohomish PUD
236th St Conduit Installation
Conduit, 3 months
Install 1900 LF of bored Sewer Force Main.
2022, SW Suburban Sewer District
Lift Station 18 Upgrades
Sewer, 2 months
Install 3500 LF of 12” Water Main.
2022, Covington Water District
148th Watermain Extension
Water, 3 months
Install 1000 LF of 16” Sewer Force Main.
2022, Sammamish Plateau Water
Interim Central Lake Forcemain
Sewer, 3 months
Install over 8000 LF of water Main.
2022, KC Water District 20
1st Ave S Water Main Replacement - Phase 2
Water, 6 months
Repair 10 LF of sewer pipe at 26' deep, navigating utility conflicts.
2022, Seattle
Broadmoor Emergency Sewer Repair
Sewer, 4 months
Install 4,500 LF of water main, install a retaining wall and sidewalk.
2022, Tukwila
Water Main Replacement and Sidewalk Installation
Water, 5 months
Install 4,100 LF of water main and 92 services, plus full overlay.
2022, Kenmore
Northshore Utility District Water Main Replacement
Water, 6 months
Urgent repair installing a 42 inch metal sewer pipe with dual active bypass as part of a $3M King County work order.
2021, Seattle
Duwamish Interceptor Urgent Sewer Repair
Sewer, 1 month
Urgent sewer repair to reinstall 40 feet of sewer lining with dual active bypass as part of a $3M King County work order.
2021, Bellevue
Valley Creek Interceptor Urgent Sewer Repair
Sewer, 1 month
Emergency response, fixed a complicated leak in one day thanks to our specialized crew and equipment.
2021, Seattle
SW Suburban Sewer District Emergency Repair
Sewer, 1 day
Install new water main, repave roads and restore sidewalks at six sites.
2020, Seattle
Water Main Rehab Package
Water, 2 years
Install over 12,000 LF of water Main.
2020, KC Water District 20
1st Ave S Water Main Replacement - Phase 1
Water, 2 years
Install over 13,000 LF of water main and sanitary sewer; Complete re-pavement of the neighborhood.
2019, Renton
Renton Hill Utility Replacement
Water/Sewer/Storm, 18 months